Each component is manufactured here in Dresden under the roof of METZNER Engineering GmbH by using state-of-the-art CNC manufacturing equipment and measuring systems. The processing time of the four main part takes around 22 hours while machining 38 Kg of 7075-T6 aluminum. Chips as well as larger residual parts are recycled.